How long does restumping take in Ballarat?
Restumping in Ballarat usually takes a few days for a small partial reblocking job and around one to two weeks for a full-house project, depending on access under the house, how many stumps need replacing, and whether damaged bearers or joists are uncovered once the floor is lifted. Older weatherboards on sloping blocks or with tight subfloor clearance take longer. In winter, Ballarat's wet, cold conditions slow both excavation and concrete curing. Our quote gives you a start date and an expected duration, states how long the house will be jacked, confirms the permit is allowed for, and says whether re-levelling and follow-up adjustment after the stumps settle are included.